Village of Pinecrest Stormwater Master Plan Report – July 2015

The purpose of this project is to develop a Stormwater Master Plan to serve as a planning-level engineering document that analyzes the current condition of the Village’s existing stormwater management systems, identifies high priority flood prone areas, and establishes a planning-level, cost-effective conceptual designs of projects to address the flooding issues.

City of Miami Comprehensive City-Wide Stormwater Master Plan Final Report – March 2021

Due to changes in land use, increasing sea level rise, and the changing regulatory environment over time, the development of a new and comprehensive Citywide SWMP was desirable to assist the City in establishing a policy framework so that the integrity of the City’s future is protected and enhanced over time. This project planned and developed a newly updated and comprehensive Citywide stormwater model, SWMP, and the creation of a modern GIS database digitally mapping its PSMS stormwater assets.

Village of Key Biscayne Storm Water Master Plan

The Village of Key Biscayne (“Village” or VKB), a municipality located in Miami-Dade County, Florida, issued a request for qualifications (RFQ) solicitation for the selection of a firm to provide professional engineering services to the Village for the purpose of preparing and assisting in the stormwater improvement implementation plan for the Village’s stormwater improvement projects.

Opa-locka CRA Downtown Master Plan 2021

This plan does not look at Opa-locka’s future through a single lens. It is equally about economic opportunity and equity, large scale development and preserving people in place, culture and small businesses, private sector initiative and public sector leadership.

City of Doral Green Master Plan 2008

The goal of the Green Plan is to conserve natural resources, enhance quality of life, bolster economic vitality, and leave a sustainable legacy to future generations of City residents.

City of Doral 2021 Stormwater Master Plan Update

The primary objective of this SWMP update is to develop a new 5-year CIP. As part of the 5-year CIP, stormwater improvement projects were identified and ranked based on cost-effectiveness to address the current high priority water resource issues, flooding, and mitigate the sea-level and groundwater rise to the maximum extent possible for the climate change projected for the Year 2050 planning horizon.

Bal Harbour Village Utility Master Plan

The purpose of this study is to prepare the basis for an engineering analysis and Master Plan for the replacement of the Village’s aging utility infrastructure.

Town of Cutler Bay Stormwater Master Plan

The purpose of this Storm water Master Plan is to identify opportunities to protect surface water quality and reduce flooding within the limits of the Town of Cutler Bay, Florida.